Havana Advance support of small conduitWhat is your design theory
release time:2023-01-19 17:24:50

When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself,Havana Advance small conduit and pipe shed, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.Havana , The grouting pipe of the spring reinforcement framework shall be bound with the bamboo frame of the reinforcement framework according to the construction rigidity of the component. After being bound into a bundle, it shall be stacked at the specified position and lifted to the abutment cross. During the reinforcement binding process, the quality and wall shall be strictly controlled according to the ship support, and the finished product shall be well protected. The injection pipe shall be placed on the top, and the embedded grouting symbol shall be buried on the formwork for positioning. The inverted formwork shall be used to install stairs and component side formworks to increase the turnover rate of the formwork as much as possible. According to the design size, the formwork shall be equipped with plate cutting machine and edge folding machine Cutting shall be carried out by profile training machine, rebar concealment and cross slab shall be carried out according to blanking standards. Unqualified ones shall be rectified until they meet construction technology. Concrete pouring Before concrete mixing, Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.


Havana Advance support of small conduitWhat is your design theory



The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. The installation is simple, fast and firm. At least one part of the grouting conduit buried in the concrete shall be firmly bound with the structural reinforcement; The length of the grouting duct leading out of the concrete shall not be less than mm; The leading end of the grouting conduit shall be set at a convenient and accessible position. No part of the grouting conduit shall be flattened or bent to avoid affecting the flow of grout. The opening end of the conduit shall be temporarily blocked to prevent foreign matters from entering. The damaged part of the grouting pipe shall be cut off, and the grouting pipe with the installed grouting pipe shall be re set at the cut-off part, and shall be overlapped with the original grouting pipe at both ends.When binding or welding reinforcement near the grouting pipe, temporary shielding measures shall be taken to protect the grouting pipe. The calculation of the reserved expansion amount of the grouting pipe and the bridge expansion joint changes all the year round. With the change of temperature and the change of vehicle live load, the bridge will shrink and deform. The grouting pipe and the bridge expansion joint play a major role at this time. The expansion amount of the grouting pipe and the expansion joint must be calculated accurately. The installation and construction of the grouting pipe and the expansion joint need to ensure the quality. We should select the model and type of grouting pipe and bridge expansion joint, and determine the installation time, installation season and temperature of grouting pipe and expansion joint. Calculate the large and small preload of grouting pipe and expansion joint.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head and the size matches the flange of the Christmas tree wellhead.Sales Department,The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time, which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension,Havana 22hollow composite anchor manufacturer, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction. It is safe and does not need to be welded on site.


Havana Advance support of small conduitWhat is your design theory



The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.Click to view,However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending, which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, awesome, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking. Special slings shall be used for lifting horizontal components such as laminated plates, and the stress of each lifting point shall be uniform to avoid fracture due to uneven stress of components. Grouting method is a method of injecting some curable grout into the cracks or pores of rock and soil foundation to improve its physical and mechanical properties. The purpose of grouting is to prevent seepage, stop leakage reinforce and correct the deviation of buildings.The grouting mechanism includes filling grouting, seepage grouting, alkali solution method,Havana Customized leading small catheter, polymer chemical grouting method and cement grouting method. It is applicable to the laying of buried pipes in gas pipeline projects, and is not applicable to the use of open pipes. The service life of pipes will be affected by the perennial ultraviolet corrosion of sunlight. How to use the grouting pipe after rusting will not affect its . The grouting pipe is a kind of rubber plate we often see. It is widely used and has a long service life. It has been praised and recognized by people. Next I will introduce the relevant knowledge of the grouting pipe we produce in detail!Havana , It is safe and does not need to be welded on site.In the construction of some grouting pipes, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


comment list
©2009-2024Industrial Microblog  Sitemap