Jade SpringFixed stage elevatorConvenience
release time:2024-07-10 18:54:51

The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Maintenance of elevator hall doors and car doors. Elevator malfunctions usually occur on the elevator hall and car doors, so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, so that the elevator will not make unpleasant noises during operation and the opening of the door. Pay attention to the inspection of the safety contact plate or light curtain type contact plate switch wire of the elevator, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work and replace it in advance to avoid users having doubts about the quality of the elevator product due to door issues.Jade Spring,Slide elevators are installed inside buildings and are often used parallel to buildings and sidewalksThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case,Jade SpringVilla Home Seat Elevator, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Yen Vinh,Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling it will cause wear and tear on the mechanical components of the elevator, so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, so that the elevator will not make unpleasant noises during operation and the opening of the door. Pay attention to the inspection of the safety contact plate or light curtain type contact plate switch wire of the elevator, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work, and replace it in advance to avoid users having doubts about the quality of the elevator product due to door issues.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


Jade SpringFixed stage elevatorConvenience



The door closing button has no self maintenance function. During the designated maintenance period, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.The gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry craneAttention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis,Jade SpringElevating platform stage, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.supplyAttention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator,Jade SpringTwo roll hydraulic fully automatic plate rolling machine, greatly shortening its service life and preventing normal use of the elevator.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degrees


Jade SpringFixed stage elevatorConvenience



The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Honesty is the foundation,Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.The elevator suddenly opens the door and does not move after leveling, but automatically resumes operation after a few minutes: The elevator (escalator) has been running for too long, and the motor overheats. To prevent burning out, users can be required to make a circle of beams at a certain height, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Jade Spring,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, and special attention should be paid to moving parts such as counterweights and wire ropes).The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, attention should be paid to the length of the pit or the opening of the floor slab which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The call button on each floor is no longer working, and the call is cut off.


comment list
  • hongwei power co., ltd.

    The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good Jade

  • bofan pipeline co., ltd.

    Finally got Jade SpringFixed stage elevator So happy that! The workmanship is great.

  • Shengmao Harbour Shopping Company

    I heard a colleague's introduction to buy Jade SpringFixed stage elevator, and they all said that the quality is good, and I will come to your house next time. Ha ha.

  • Except on-street parking

    I have been shopping online Jade SpringFixed stage elevator for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanship.

  • Evergreen Technology Landscape Company

    Cooperation with you is really good, Jade SpringFixed stage elevator good quality, come to our company again if you have time.

  • Technology development of software and office automation equipment

    This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this Jade SpringFixed stage elevator. They exp

©2009-2024Industrial Microblog  Sitemap