ZegradStage lifting platformCloser integration of industry concentration
release time:2023-11-11 09:45:15

Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersZegrad,The elevator stops on the first floor and the door does not move: the fire emergency landing function of the elevator is triggered by smoke or thermal sensors inside the building.Restore the command button function in the cabin for firefighters to operate.Lucenec,When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.b. When the old elevator cannot start: due to the inability to enter the shaft,ZegradTwo roll hydraulic fully automatic plate rolling machine, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, greatly shortening its service life and preventing normal use of the elevator.


ZegradStage lifting platformCloser integration of industry concentration



The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.The seat elevator person sits on a chair driven by an electric motor, and the button on the chair handle causes the power drive device at the bottom of the chair to drive the person chair up and down along the guide rail of the staircase railingThere is a dedicated fire telephone in the fire elevator car.equipment maintenance ,ZegradAluminum alloy mast type lifting platform,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.


ZegradStage lifting platformCloser integration of industry concentration



Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Which one is better,During the use of elevators, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.When passengers are riding on the escalator they may lose their balance and fall due to leaning against the skirt board on the side of the escalator, which does not move,ZegradHigh altitude material retrieval platform, but their feet move with the steps. Especially when carrying a lot of packages while taking the elevator, it is more likely to fall on the escalator due to the inability to hold the handrail properly. So, when riding on the escalator, we must stand firmly and support it well, and do not lean against the skirt board on the side of the escalator.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Zegrad,b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters

comment list
©2009-2023Industrial Microblog  Sitemap