When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment,maardu Difference between power transformer and dry-type transformer, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.maardu ,How to maintain dry-type transformer?The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Saint-Marc, if the second phase is blocked the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Power transformers are used in all walks of life
When the transformer is out of phase, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore,maardu 500 kV dry type transformer, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!Installation material list,Common problems of tap changer of power transformerHow much is the power transformerAfter sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.
The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.recommend, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Several detection methods for installing transformerOperation and maintenance management of oil immersed transformermaardu ,Falling foreign matters and piercingPower transformer manufacturerIn terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;
maardu Oil immersed transformer 1600KVA It’s really good, how long does it take to arrive after the departure?
Brother, with your support, this new model maardu Oil immersed transformer 1600KVA is indeed up to standard and very good.
After my personal experience, the reputation of this store is quite good. maardu Oil immersed transformer 1600KVA The quality is more like a diamond. Thank you so much!
maardu Oil immersed transformer 1600KVA The quality is very good, I bought it for the second time, the goods are good, the boss is very good
Just bought maardu Oil immersed transformer 1600KVA, the quality workmanship is even worse. Look back and introduce to friends