NicoyaGrouting seamless pipeToday’s market
release time:2023-01-12 19:00:44

Low cost, fast time, no loss free from climate and place constraints.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction,NicoyaGrouting small conduit, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap such as greatly improving the pile side friction resistanceNicoya, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Larissa,The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes? Low cost, fast time, no loss, free from climate and place constraints.At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe,NicoyaGrouting hollow anchor manufacturer, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes. When the concrete strength can ensure that its surface and edges are not damaged due to formwork removal, the side formwork can be removed. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?resources,The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil. It is safe and does not need to be welded on site. performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel,Nicoya25hollow grouting anchor bolt manufacturer, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.


NicoyaGrouting seamless pipeToday’s market



The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.Affordable price The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance. Installation of grouting pipe the method of installing grouting pipe is to bundle the grouting pipe and add -mm semi-circular flower pipe at the upper end of the reinforcement construction; As the project is a bored pile, the commonly installed grouting pipe is a straight pipe. A diffuser with one-way is set at min below the pipe. The grouting pipe is installed at the end of the reinforcement cage installation and sediment treatment (because the end of the bored pile is cone-shaped, in order to avoid damaging the one-way diffuser at the end of the grouting pipe when lowering the reinforcement cage, it is not appropriate to bundle the grouting pipe on the reinforcement cage and lower it at the same time.) The grouting pipe is set in the diffuser with one-way , and must be wrapped with a special inner tube. After the pipe is lowered, the grouting pipe must be filled with water and the upper end of the grouting pipe should be blocked.The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, angular so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.Nicoya,General treatment method: first, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.? The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.


comment list
©2009-2024Industrial Microblog  Sitemap