Le Valo VarpeNiuli brand electric elevatorMethod of weighing
release time:2023-05-11 22:06:03

Before installation the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.The L distance depends on the selected wall mount model.Le Valo Varpe,. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, ifWhen the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above effective protective measures should be taken.Medgidia,Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Stage equipment safety door. To prevent personnel from extending their heads,Le Valo VarpeFour wheel electric elevator, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical,Le Valo VarpeAluminum alloy electric elevator, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.Before installation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, and concrete strength report.


Le Valo VarpeNiuli brand electric elevatorMethod of weighing



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),The L distance depends on the selected wall mount model.investment,Setting requirements: The landing door should be standardized and tooled.For customers to use and operate the lifting platform for a long time,Le Valo VarpeElectric mobile elevator, the editor briefly introduces how to maintain and repair the lifting platform: First of all, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems resulting in costly repairs.The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.


Le Valo VarpeNiuli brand electric elevatorMethod of weighing



Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.Installation materials,Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Installation position of upper limit switch: Under normal working conditions, the distance between the upper limit switch and the upper limit switch is .m for SC type construction electric elevators, and .m for SS type construction electric elevators (person)During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.Le Valo Varpe,Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.


comment list
  • Clean ventilation project

    Le Valo VarpeNiuli brand electric elevator Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

  • machine readable card

    Le Valo VarpeNiuli brand electric elevator It’s really good, how long does it take to arrive after the departure?

  • fruit

    Haha, Le Valo VarpeNiuli brand electric elevator received! It's too late to confirm, sorry, the boss is very fashionable!

  • cold water

    Let me evaluate this Le Valo VarpeNiuli brand electric elevator, the price is good, the quality is good, the delivery is good, and the boss is good.

  • daikang printing co.

    Just paid, when will Le Valo VarpeNiuli brand electric elevator arrive, boss.

  • Indoor fire hydrant

    Le Valo VarpeNiuli brand electric elevator The price is very high, and the quality is very good if you can buy it at such a price.

©2009-2024Industrial Microblog  Sitemap