The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Pavia, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side,PaviaDouble column aluminum alloy lifting platform, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Arua,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.The front room of the fire elevator is equipped with indoor fire hydrants.
Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.Elevators are used to transport firefighters passengers,PaviaStage curtain elevator, and fire-fighting equipment in the event of a fire. They are used to transport frozen goods in large cold storage or refrigeration workshops. However, they need to meet the requirements of sealing the door leaves and guide rails at the moving parts. Professional household elevators, villa household elevators, household elevator manufacturers, and small household elevators have stable, safe, reliable, and their technical level has reached the domestic level, Meet the advanced level of international similar products and immersion requirementsThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).wholesaler,The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.
Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Latest consultation,The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Overloaded elevators do not operate: The load of elevators is limited, and if they are overweight,PaviaResidential use of indoor elevators in duplex buildings, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.If the elevator is in a downward direction, immediately close the door and return to the first floor station, and automatically open the elevator door.Pavia,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.If the elevator is already on the first floor
Very good buyer. Thank you. My colleagues like it very much PaviaAluminum alloy mobile lifting platform. Come again next time
PaviaAluminum alloy mobile lifting platform Very cost-effective! It is worth buying like everyone! worth having!
Old acquaintances, things are as good as always, genuine PaviaAluminum alloy mobile lifting platform, outstanding cost performance
Very good buyer. Thank you. My colleagues like it very much PaviaAluminum alloy mobile lifting platform. Come again next time
PaviaAluminum alloy mobile lifting platform Delivery is really fast, too efficient, the product has been received, give you a good comment.