MalingaSeamless pipeManufacturers reduce production and increase, and the national inventory will be transferred to decline pass again
release time:2023-11-17 21:45:23

Special slings shall be used for the lifting of horizontal members such as laminated plates and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price,MalingaSeamless pipe, service, strengthen and correct the deflection of buildings.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method stop leakage, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

MalingaSeamless pipeManufacturers reduce production and increase,MalingaPrecision tube, and the national inventory will be transferred to decline pass again


Push the rock powder and sundries that are not washed, remain at the hole bottom, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, especially the slurry stop plug.MalingaSeamless pipeManufacturers reduce production and increase,MalingaSteel pipe, and the national inventory will be transferred to decline pass again,2023-11-1721:45:22The grouting mechanism includes filling grouting infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

MalingaSeamless pipeManufacturers reduce production and increase, and the national inventory will be transferred to decline pass again


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Malinga,Garango,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

comment list
  • Tongxing Pure Water Company

    Since searching and shopping online, you never have to go out and wander around. Your MalingaSeamless pipe quality is guaranteed, logistics and delivery are fast, big brands are better than offline st

  • Energy-saving technology research and development and technical consultation

    Old acquaintances, things are as good as always, genuine MalingaSeamless pipe, outstanding cost performance

  • flanging

    After my personal experience, the reputation of this store is quite good. MalingaSeamless pipe The quality is more like a diamond. Thank you so much!

©2009-2023Industrial Microblog  Sitemap