When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.Information recommendation,When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Setting requirements: The landing door should be standardized and tooled.
With the continuous improvement of urbanization level in China the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.project,The verticality of the guide rail frame should meet the requirements of the specifications.The coaxiality between the motor shaft and the worm shaft in the aluminum alloy electric elevator drive device should be less than .mm, and there should be a mm gap at the shaft end to ensure that the motor bearings bear reasonable loads and reduce motor operating noise; electricWork is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.Mentougou,The use of standard section connecting bolts should comply with the user manual and specification requirements.The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.Secondly, it can be replaced once a year. The hydraulic oil must be clean it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.
It is very comfortable to do business with you. Responsible, serious, Mentougou1 ton electric elevator is also good, I must give you a good comment. Looking forward to the next cooperation, I wish Rij
Mentougou1 ton electric elevator Very cost-effective! It is worth buying like everyone! worth having!
I will find you again next time I have the opportunity.