Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.Mohaki,Greater than .s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall notIn order to meet the needs of contemporary audiences and achieve perfect effects in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, suspension points, lighting bridges, lighting suspension cages and fire curtains. Under the stage, there are lifting platforms, car platforms,MohakiMobile electric elevator, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables,MohakiMobile electric elevator, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery,MohakiElectric elevator lifting 10 meters, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.French Guiana,Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.
Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.The L distance depends on the selected wall mount model.Highly recommended,The list of materials for making landing doors is as follows: Table : List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.
Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places family dormitories, andinstall,Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, vehicle mounted lifting platform, self-propelled lifting platform, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, cylinder sleeve lifting platform, and specialThe landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.Mohaki,Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.
MohakiElectric chain elevator The quality is very good, I bought it for the second time, the goods are good, the boss is very good
I finally received what I needed MohakiElectric chain elevator, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping expe
I will buy it in the future MohakiElectric chain elevator and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!
After looking for the MohakiElectric chain elevator from your family for a long time, I mustered up the courage and the quality of the inspection was very good.
MohakiElectric chain elevatorHow much is it and how can I sell it?