HeilongjiangElectric rope climbing machine elevatorSee how to increase business income
release time:2023-05-12 13:44:38

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around -mm, and the top layer is not affected. It can be customized according to the location and environment.HeilongjiangThe cargo is .m.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.sierra leone,Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered downWork is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.The setting of the cable guide frame should comply with the user manual and regulatory requirements.


HeilongjiangElectric rope climbing machine elevatorSee how to increase business income



Stage equipment safety door. To prevent personnel from extending their heads, hands,HeilongjiangElectric screw elevator, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical,HeilongjiangExternal wall electric elevator, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.m; When the lifting speed is greater than .m/s, after the upper limit switch is triggered by the hanging cage, the upper small safety distance L should meet the following requirements: L=+.V, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB&flash; The rotation of the SB motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.Standard requirements,The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing,HeilongjiangGuide rail electric elevator, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.


HeilongjiangElectric rope climbing machine elevatorSee how to increase business income



The use of standard section connecting bolts should comply with the user manual and specification requirements.Test results,Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.Degrees, m/s.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature dropsHeilongjiang,Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance, wear deformation, and corrosion of steel wire ropesEspecially suitable for steel structured factories, suitable for both indoor and outdoor installation.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.


comment list
©2009-2024Industrial Microblog  Sitemap