Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.The motor of the hydraulic guide rail lifting platform is set around the wellbore, improving the utilization rate of the wellbore area.Grosseto,Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.Ilam,The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.


GrossetoElectric vertical elevatorWhat are the reasons for the fast wear



Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Is there a relevant rule requirement for the cleanliness of hydraulic stations?Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.technical service,Before operating the construction electric elevator,GrossetoHand propelled electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.Mechanical devices controlled by cage movement should not be used to open or close the landing door.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


GrossetoElectric vertical elevatorWhat are the reasons for the fast wear



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.Workshop cost,The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.Aluminum alloy lifting platforms can be divided into single column aluminum alloy,GrossetoSmall electric elevator, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, parking lots, municipal facilities, docks, buildings, and installationsSetting requirements: The landing door should be standardized and tooled.Grosseto,Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel,GrossetoElectric mobile elevator, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.