DunkirkElevating cargo elevators from first to second floorsAnalysis of the problems that should be paid attention to in the process of charging
release time:2024-07-11 14:29:59

The wrong connection of the motor of the elevator When a coil, coil group or one-phase winding is reversed, it will cause a serious imbalance in the three-phase current and cause the winding to overheat.It is strictly forbidden to switch the electric control switch with wet hands. Many people tend to ignore this detail. Although the safety voltage of the hydraulic lifting platform is below V,DunkirkOne ton cargo elevator, if you touch the power supply with your hands, it may cause lifting failure in light cases, or electric shock accidents in severe cases.Dunkirk,The guide rail type elevator is a kind of equipment for transporting heavy objects up and down. It has a very good application in factories, workshops and other places. For this kind of heavy machinery, its daily maintenance and maintenance are very important because some small details If you don't pay attention, it will have a great impact on the operation safety of the equipment, adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, remove the motor shaft key.Uromi,Many customers think that the operating power supply of the hydraulic lifting platform is below the safe voltage of V, and there will be no electric shock. They are wrong. Normally, there will be no electric shock, but if there is improper operation, it will still be very dangerous. So how can we effectively prevent the occurrence of electric shock accidents? Today, the editor will share safety knowledge with you.Today the editor will talk about a series of safety devices and their uses on the guide rail hydraulic lifting platform.The hydraulic lifting platform is mainly the pressure transmission of hydraulic oil to realize the lifting function. Its scissor mechanical structure makes the lift stable, and the wide operating platform and high carrying capacity make the high-altitude operation wide and suitable for many people work at the same time. It makes high-altitude operations efficient and secure.


DunkirkElevating cargo elevators from first to second floorsAnalysis of the problems that should be paid attention to in the process of charging



The contact opening and closing of the travel switch of each safety device must be reliable, and the contact arc crater should be polished in time.Aluminum alloy elevators are also called aluminum alloy lifting platforms. At present, there are many types in the Chinese market, and they are very popular among users because of their flexible movement, light weight and small size.Many people think that the strength of the elevator itself is relatively high when using the elevator, so they did not strictly follow the installation method in the manual during the installation process, but they do not know that this will cause increased wear and tear of the parts and inflexible operation, and pay attention to the work The installation precautions corresponding to the environment should not be ignored. Correct installation, use and maintenance of elevators are an important part of ensuring the normal operation of mechanical equipment. Therefore, when you install the elevator, please be sure to strictly follow the installation and use related matters below, and assemble and use it carefully.knowledge,Pay attention to check whether there are any broken wires and loose strands in the wire ropes of each part. If it exceeds the relevant regulations, it must be replaced immediately. The maintenance of the wire rope should be strictly in accordance with regulations.Low cost: The cost is much lower than that of the scissor-type mobile lifting platform, so when purchasing a lifting platform, you must consider the scope of use of the lifting platform, the frequency of work, the load and other factors to choose a lifting platform that suits the work requirements .Frequently check the humidity of the aerial work vehicle that is prone to water accumulation. It is inevitable that the aerial work vehicle is driving in rainy and snowy weather, or on muddy roads. The bottom and some gaps and indoor floors are easy to accumulate sludge. If the owner does not clean it in time, this will hide the moisture. Therefore, the outer edge of the wheel hub, the door, the corner of the bottom of the trunk, the key hole and the wiper frame and other areas should be checked regularly, and the drainage holes in the door and various parts should be kept unblocked to ensure that the car seat covers, carpets and floors are protected from humidity. Rusty fittings.


DunkirkElevating cargo elevators from first to second floorsAnalysis of the problems that should be paid attention to in the process of charging



Mechanisms: Mechanisms such as tabletops, wire ropes, chains, and pulleys are made of solid materials to ensure safety.Interpretation and observation,Frequently check whether the various mechanisms are operating normally and whether there is any noise. If a fault is found, it must be eliminated in time.Drain the hydraulic oil of the hydraulic lift and discard it. Tighten the joint to take out the oil filter. After cleaning, then put it back into the oil tank, and connect the pipeline.Whether it is used outdoors or indoors, some small problems will inevitably appear after a long period of time. At this time, what we should do is to maintain and maintain the elevator. How to follow the steps correctly It has become a difficult problem, and I will answer it with you.Dunkirk,Always check all wires and cables for damage. The damaged part should be bandaged and replaced in time.Check the limit switch to see if all the limit switches are loose. If so please tighten them. Pay special attention to the ultra-high protection stroke of the hydraulic lifting platform to avoid accidents caused by the equipment exceeding the high safety height; check the pins (ear pins and center pins) Check whether the nuts, nuts, screws, etc. are loose, if any, should be reinforced immediately; ensure that the hydraulic lifting platform rises and falls smoothly; outriggers (for high-altitude operating platform)In addition,DunkirkHydraulic lifting cargo elevator, during installation, it is strictly forbidden to use hammers, etc. to prevent damage to bearings or gears due to excessive axial force or radial force. Be sure to tighten the mounting bolts before tightening the force bolts. Before installation, clean the anti-rust oil on the motor input shaft, and to prevent unnecessary wear and tear.


comment list
  • Kambo Manufacturing Co.

    The packaging DunkirkElevating cargo elevators from first to second floors looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again

  • Xinleyuan Business Services Company

    DunkirkElevating cargo elevators from first to second floorsHow much is it and how can I sell it?

  • performance planning

    The delivery speed is very fast, give your company a thumbs up

  • Activated carbon forest chemical product manufacturing

    DunkirkElevating cargo elevators from first to second floors The quality at this price is excellent value for money

  • Sales of range hoods

    Let me evaluate this DunkirkElevating cargo elevators from first to second floors, the price is good, the quality is good, the delivery is good, and the boss is good.

  • Gas stoves

    The seller is really good, DunkirkElevating cargo elevators from first to second floors is the same as the introduction, honest seller

©2009-2024Industrial Microblog  Sitemap